

Screed Sheenlac F2050
- High Durability
- Excellent Adhesion
- Smooth Finish
- Fast Setting Time
- Versatile Application
Features
Crack Resistance
Easy Application
Moisture Resistance
Low Shrinkage
Load Bearing Capacity
How to Apply
Priming
Apply a suitable primer to the surface if necessary, to enhance bonding and prevent moisture absorption.
Levelling
Use a spirit level or laser level to ensure the screed is perfectly flat and even across the entire area.
Jointing
Create expansion joints where needed to accommodate any movement and prevent cracking.
Finishing
Once the screed is set but not fully cured, smooth the surface with a finishing trowel for a flawless finish.
Downloadable Resources
Idea Spot


![city-park-light-fluorescent-dark_1127-2364[1]](https://sheenlac.com/wp-content/uploads/2024/05/city-park-light-fluorescent-dark_1127-23641.jpeg)
Frequently Asked Questions
It can be applied to concrete, cement, and other suitable subfloor materials.
The curing time varies, but it typically takes 24 to 48 hours for light foot traffic and up to 7 days for full load-bearing capacity.
Yes, it is designed for versatile use in both residential and commercial settings, offering high durability and performance.
The recommended thickness ranges from 3mm to 50mm, depending on the specific requirements of the project.